We check your project for you to determine the possibility of repowering and thus increasing the power yield many times over at the same location. With higher-power installations, you can generate higher yields and benefit from a more economical operation of your installation over the long term. We support you in all phases of the repowering – from development and approval through to construction of the repowering project, as well as demolition and recycling of the old installation.
Repowering services:
- Support in deciding between continued operation of the old installations and repowering
- Checking the yield data, maintenance costs, pending repairs and possible yields from direct selling
- Analysing the yield potential
- Checking the current legally permissible basis for building modern installations at the same location (especially height limits and distance regulations)
- Developing the new wind farm and securing permits
- Demolition of the old installations and turnkey construction of the new installations
Repowering references
Nine times more energy yield through repowering/demolition
Representation based on our own Bernsdorf/Gersdorf repowering project
You can view a video on repowering here:
Demolition

“Thanks to well-coordinated planning, the installation was demolished in next to no time and there is no sign of the wind turbine that once stood here.”
Maik Hoffmann,
Construction Manager and Health and Safety Coordinator at Sabowind GmbH
Sabowind handles the full dismantling of the wind turbines, complete demolition of all foundations and unneeded roads and disconnection from the grid. The property is brought back to its original condition, returned to agricultural use or prepared for the construction of new installations.
Demolition and dismantling services:
- Obtaining the required permits
- Project coordination
- Securing the construction site for temporary storage and on-site dismantling
- Complete dismantling of the old installation
- Demolition of foundations, unneeded roads and transfer stations
- Removal and proper disposal of the installation’s components
- Electrical disconnection from the grid
Demolition of a wind turbine in the Bernsdorf/Gersdorf wind farm