In Tanna, which is located in Thuringia eab Projektmanagement GmbH started the construction works on 4th November 2013 for two wind energy turbines of the type Enercon E-101, which has a hub height of 149 m and a rated power of 3,05 MW and an Enercon E-92 with a hub height of 138 m and a rated power of 2,35 MW. So far the Enercon E-101 will be the highest wind energy turbine in Thuringia with a total height of 199,50 m.
Roads and both foundations are already finished. In calendar week 11 the roads to the crane hardstanding as well as the laying of the cable to the position of the transfer station were established. In April the turbine erection will start in order that both wind energy turbines will go into operation until the end of the first half-year. With the annex of these two turbines the already existing wind farm in the north of Schilbach will be expand to 11 wind energy turbines.
The technical and commercial management is adopt by eab Windservice GmbH.
Highest WET in Thuringia
In Tanna, which is located in Thuringia eab Projektmanagement GmbH started the construction works on 4th November 2013 for two wind energy turbines of the type Enercon E-101, which has a hub height of 149 m and a rated power of 3,05 MW and an Enercon E-92 with a hub height of 138 m and a rated power of 2,35 MW. So far the Enercon E-101 will be the highest wind energy turbine in Thuringia with a total height of 199,50 m.
Roads and both foundations are already finished. In calendar week 11 the roads to the crane hardstanding as well as the laying of the cable to the position of the transfer station were established. In April the turbine erection will start in order that both wind energy turbines will go into operation until the end of the first half-year. With the annex of these two turbines the already existing wind farm in the north of Schilbach will be expand to 11 wind energy turbines.
The technical and commercial management is adopt by eab Windservice GmbH.
- Type of turbine:
- Enercon E-101/149m
- Enercon E-92/138m
- Number of turbines:
- 2
- Rated output (kW):
- 5400
- Year:
- 2013
- Country: